Take a look at our most recent case studies where we have showcased the exceptional electrical services we have completed for a diverse range of both domestic and commercial projects.
We recently completed this installation of infrared heaters at a village hall. The client was frustrated with the inefficiency of heating the hall, especially when it was not in use, compounded by the lack of insulation.
This solution offers a more responsive and efficient approach. The heating can be activated upon entering the hall and is managed through a thermostat and a time-delay switch for optimal control.
Underfloor heating was installed, ready for the screed and final floor covering. This system provides a balanced, comfortable heat, making it the perfect choice to warm this garage conversion.
The client upgraded their home heating with a change point installation, making the most of the Energy Saving Trust grant and receiving £400 toward the cost. This efficient solution offers precise control, ensuring energy is only used when needed, saving both money and resources.
Lighting and emergency lighting, power supplies, and fire alarm systems are all part of our remit on this job.
The client upgraded their home heating with a change point installation, making the most of the Energy Saving Trust grant and receiving £400 toward the cost. This efficient solution offers precise control, ensuring energy is only used when needed, saving both money and resources.
Lighting and emergency lighting, power supplies, and fire alarm systems are all part of our remit on this job.
Take a look at this exciting project by scrolling through the images and clicking on them to explore even more details and insights about our work.
Project Brief: To swap out around 50 old light fittings and the fire alarm system.
Our Approach: We replaced old lighting for modern energy efficient led panel lights and replaced the emergency light fittings. The smoke detectors are mains power with lithium battery backup.
Project Brief: In this golf club the client wanted to keep the traditional brass effect but also wanted modern led lighting.
Our Approach: We reduced the amount of light fittings and fitted brass accessories to match the existing fixtures.
Carried out a full shop refit at 2020 Vision, opticians.
Project Brief: This job we took four weeks from start to completion. We worked 14 hour shifts to avoid as much interruption for the business as possible. Job consisted of power, lighting, emergency lighting and fire alarm installation.
The shopfitting was carried out by LS Shopfitting. More detail to follow.
Defibrillator installs in East Lothian
Project Brief: We were contacted by a local charity to install 5 defibrillator units in the North Berwick and Gullane area.
Our Approach: Liaising with community council we learned that one of the individuals raising funds was a friend of ours. We were more than happy to get involved in installing potentially life saving equipment at local venues.
Carried out at Davidsons Feeds, West Lothian.
Project Brief: The client wanted better lighting in their yards for winter and night operations, as well as a low-maintenance alternative to their sodium lights.
Our Approach: We recommended Agron LED 150W flood lights with a 5-year warranty, using existing power sources. A team of 3 completed the work within 2 weeks using a cherry picker.
The satisfied client has since referred us to other businesses.
This LED lighting is ideal for car parks, showrooms, farms, warehouses, garages, schools, and other commercial areas.
This 55″ TV installation was carried out at Michael Laird Architects in Edinburgh.
Project Brief: The client wanted to create a boardroom that was suitable for presentations and meetings that utilise modern technology, including a 55″ television and full compatibility with laptops and iPads.
Our Approach: We provided multiple connections for laptops via an HDMI connection fed through a floor box under the desk. We also set-up iPads to connect to the Apple TV and supplied power and the internet connection for the TV to ensure full Smart TV functionality. All cables were concealed within the walls and under the floor, which was solid concrete, to keep the space tidy and avoid trip hazards. We also organised a plasterer and painter to finish off the job once the electrical work was completed to ensure the space was ready to use straight away.
The Confectioner factory was divided into 2 units and an additional 3 phase supply was provided by Scottish power.
Project Brief: Our job was to install a new fuse board and migrate existing electrical circuits onto new board and minimise down time for the business.
Our Approach: We provided a new isolator and bus bar chamber to distribute the existing 3 phase supplies to the other fuse boards within the property. This was carried out over a weekend to prevent down time for the business.
Garden lighting project in Corstorphine.
Project Brief: The client was looking for external lighting that she could enjoy when sitting in the garden.
Our Approach: We suggested using led spike lights on the ground to light up the features around the garden and can be directed and adapted as the seasons change.
We also installed the lights on a timer and dusk sensor so the lights would come on when it got dark and switch off at the desired time.
The work lasted around 2 days from start to finish and was completed within budget.
Lighting project in in Gullane.
Project Brief: The client was building and extension and the contacted us directly to undertake electrical work including external lighting, internal lighting, power and audio visual.
Our Approach: We were shown the plans and over a few visits agreed timescales and costings. We worked along side the builders and plumbers to ensure the project ran on time and on budget.
Outdoor lighting project in Buckstone, Edinburgh.
Project Brief: Rewire existing original coach lanterns around the property. The client had issues for years with power tripping especially when it rained. After inspecting the installation we advised that the whole external lighting circuit was completely renewed as it hadn’t been installed correctly.
Our Approach: We ran steel wire armoured cable to all 6 light fittings and renewed internal cabling inside the fittings. We also cut the path and refilled to bury the new cable.
Project Brief: We were contacted to advise in the best solution to heat a whole nursery mid winter as existing system had failed leaving them at risk of closure due to health and safety issues.
Our Approach: We recommended the Rointe Kyros energy efficient radiators as they are fully programmable and thermostatically controlled.
In total we fitted 22 throughout the property. Mostly we fitted them at high level for safety reasons to keep them out of reach.
We carried the work out over 2 weekends as it was more practical for everyone involved.
Driveway lighting project in Braidhills.
Project Brief: The client found the driveway very dark in the evenings when coming home and leaving in winter mornings.
Our Approach: We installed led bulkheads low level along the existing wall with motion sensors at either end to activate lights when leaving the house and when you enter the driveway.